Six Sigma Fun: For Want of an FMEA, the Empire Fell

by Matthew Barsalou, guest blogger

For want of a nail the shoe was lost,
For want of a shoe the horse was lost,
For want of a horse the rider was lost
For want of a rider the battle was lost
For want of a battle the kingdom was lost
And all for the want of a horseshoe nail. (Lowe, 1980, 50)

According to the old nursery rhyme, “For Want of a Nail,” an entire kingdom was lost because of the lack of one nail for a horseshoe. The same could be said for the Galactic Empire in Star Wars. The Empire would not have fallen if the technicians who created the first Death Star had done a proper Failure Mode and Effects Analysis (FMEA).

A group of rebels in Star Wars, Episode IV: A New Hope stole the plans to the Death Star and found a critical weakness that lead to the destruction of the entire station. A simple thermal exhaust port was connected to a reactor in a way which permitted an explosion in the exhaust port to start a chain reaction that blew up the entire station. This weakness was known, but considered insignificant because the weakness could only be exploited by small space fighters and the exhaust port was protected by turbolasers and TIE fighters. It was thought that nothing could penetrate the defenses; however, a group of Rebel X-Wing fighters proved that this weakness could be exploited. One proton torpedo fired into the thermal exhaust port started a chain reaction that led to the station reactors and destroyed the entire battle station (Lucas, 1976).

Why the Death Star Needed an FMEA

The Death Star was designed by the engineer Bevil Lemelisk under the command of Grand Moff Wilhuff Tarkin; whose doctrine called for a heavily armed mobile battle station carrying more than 1,000,000 imperial personnel as well as over 7,000 TIE fighters and 11,000 land vehicles (Smith, 1991). It was constructed in orbit around the penal planet Despayre in the Horuz system of the Outer Rim Territories and was intended to be a key element of the Tarkin Doctrine for controlling the Empire. The current estimate for the cost of building of a Death Star is $850,000,000,000,000,000 (Rayfield, 2013).

Such an expensive, resource-consuming project should never be attempted without a design FMEA. The loss of the Death Star could have been prevented with just one properly filled-out FMEA during the design phase:

FMEA Example

The Galactic Empire’s engineers frequently built redundancy into the systems on the Empire’s capital ships and space stations; unfortunately, the Death Star’s systems were all connected to the main reactor to ensure that power would always be available for each individual system. This interconnectedness resulted in thermal exhaust ports that were directly connected to the main reactor.

The designers knew that an explosion in a thermal exhaust port could reach the main reactor and destroy the entire station, but they were overconfident and believed that limited prevention measures–such as turbolaser towers, shielding that could not prevent the penetration of small space fighters, and wings of TIE fighters–could protect the thermal exhaust ports (Smith, 1991). Such thinking is little different than discovering a design flaw that could lead to injury or death, but deciding to depend upon inspection to prevent anything bad from happening. Bevil Lemelisk could not have ignored this design flaw if he had created an FMEA.

Assigning Risk Priority Numbers to an FMEA

An FMEA can be done with a pencil and paper, although Minitab’s Companion software for executing and reporting on process improvement has a built-in FMEA form that automates calculations, and shares data with process maps and other forms you’ll probably need for your project.

An FMEA uses a Risk Priority Number (RPN) to determine when corrective actions must be taken. RPN numbers range from 1 to 1,000 and lower numbers are better. The RPN is determined by multiplying severity (S) by occurrence (O) and detection D.

RPN = S x O x D

Severity, occurrence and detection are each evaluated and assigned a number between 1 and 10, with lower numbers being better.

Failure Mode and Effects Analysis Example: Death Star Thermal Exhaust Ports

In the case of the Death Star’s thermal exhaust ports, the failure mode would be an explosion in the exhaust port and the resulting effect would be a chain reaction that reaches the reactors. The severity would be rated as 10 because an explosion of the reactors would lead to the loss of the station as well as the loss of all the personnel on board. A 10 for severity is sufficient reason to look into a redesign so that a failure, no matter how improbable, does not result in injury or loss of life.

FMEA Failure Mode Severity Example

The potential cause of failure on the Death Star would be attack or sabotage; the designers did not consider this likely to happen, so occurrence is a 3. The main control measure was shielding that would only be effective against attack by large ships. This was rated as a 4 because the Empire believed these measures to be effective.

Potential Causes and Current Controls

The resulting RPN would be S x O x D =  10 x 3 x 4 = 120. An RPN of 120 should be sufficient reason to take actions, but even a lower RPN requires a corrective action due to the high rating for severity. The Death Star’s RPN may even be too low due to the Empire’s overconfidence in the current controls. Corrective actions are definitely needed.

FMEA Risk Priority Number

Corrective actions are easier and cheaper to implement early in the design phase; particularly if the problem is detected before assembly is started. The original Death Star plans could have been modified with little effort before construction started. The shielding could have been improved to prevent any penetration and more importantly, the interlinks between the systems could have been removed so that a failure of one system, such a an explosion in the thermal exhaust port, does not destroy the entire Death Star. The RPN needs to be reevaluated after corrective actions are implemented and verified; the new Death Star RPN would be 5 x 3 x 2 = 30.

FMEA Revised Metrics

Of course, doing the FMEA would have had more important impacts than just achieving a low number on a piece of paper. Had this step been taken, the Empire could have continued to implement the Tarkin Doctrine, and the Universe would be a much different place today.

Do You Need to Do an FMEA?

A simple truth is demonstrated by the missing nail and the kingdom, as well as the lack of an FMEA and the Death Star:  when designing a new product, whether it is an oil rig, a kitchen appliance, or a Death Star, you’ll avoid many future problems by performing an FMEA early in the design phase.

About the Guest Blogger: 
Matthew Barsalou is an engineering quality expert in BorgWarner Turbo Systems Engineering GmbH’s Global Engineering Excellence department. He has previously worked as a quality manager at an automotive component supplier and as a contract quality engineer at Ford in Germany and Belgium. He possesses a bachelor of science in industrial sciences, a master of liberal studies and a master of science in business administration and engineering from the Wilhelm Büchner Hochschule in Darmstadt, Germany..
  

Would you like to publish a guest post on the Minitab Blog? Contact publicrelations@minitab.com

 

References

Lucas, George. Star Wars, Episode IV: A New Hope. New York: Del Rey, 1976. http://www.amazon.com/Star-Wars-Episode-IV-Hope/dp/0345341465/ref=sr_1_2?ie=UTF8&qid=1358180992&sr=8-2&keywords=Star+Wars%2C+Episode+IV%3A+A+New+Hope

Opie, Iona and Opie, Peter. ed. Oxford Dictionary of Nursery Rhymes. Oxford, 1951, 324. Quoted in Lowe, E.J. “For Want of a Nail.” Analysis 40 (January 1980), 50-52. http://www.jstor.org/stable/3327327

Rayfield, Jillian. “White House Rejects ‘Death Star’ Petition.” Salon, January 13, 2013. Accessed 1anuary 14, 2013 from http://www.salon.com/2013/01/13/white_house_rejects_death_star_petition/

Smith, Bill. ed. Star Wars: Death Star Technical Companion. Honesdale, PA: West End Games, 1991. http://www.amazon.com/Star-Wars-Death-Technical-Companion/dp/0874311209/ref=sr_1_1?s=books&ie=UTF8&qid=1358181033&sr=1-1&keywords=Star+Wars%3A+Death+Star+Technical+Companion.

Advertisements

Developing Key Performance Indicators

Key performance indicators (KPIs) are critical to ensuring a project team has the performance data it needs to sustain improvements. With KPIs, a team can evaluate the success of a project against its established goals.

Types of Metrics

There are two types of metrics to consider when selecting KPIs for a project: outcome metrics and process metrics.

Outcome metrics provide insight into the output, or end result, of a process. Outcome metrics typically have an associated data-lag due to time passing before the outcome of a process is known. The primary outcome metric for a project is typically identified by project teams early on in their project work. This metric for most projects can be found by answering the question, “What are you trying to accomplish?”

Process metrics provide feedback on the performance of elements of the process as it happens. It is common for process metrics to focus on the identified drivers of process performance. Process metrics can provide a preview of process performance for project teams and allow them to work proactively to address performance concerns.

Example of Selected KPIs

Consider an example of KPIs for a healthcare-focused improvement project:

  • Project: optimizing hospital patient length of stay
  • Outcome metric: hospital patient length of stay (days)
  • Process metrics: discharge time of day (hh:mm); time discharge orders signed (hh:mm); time patient education completed (hh:mm); discussion of patient at daily discharge huddle (percentage of patients)

In the example above the project has one primary outcome metric and four process metrics that compose the KPIs the team is monitoring. Well-crafted improvement project KPIs will include both outcome metrics and process metrics. Having a mix of both provides the balance of information that the team needs to successfully monitor performance and progress towards goals.

Teams should develop no more than three to six KPIs for a project. Moving beyond six metrics can dilute the effects of the data and make it more challenging to effectively communicate the progress of a project.

Questions to Help Select KPIs

Common questions coaches can use with teams to generate conversation about potential KPIs include:

  • What does success look like?
  • How will it be known if performance is trending away from goals?
  • What data would the stakeholders and sponsors be most interested in?
  • What data is available to the team?

The 3Ms: Meaningful, Measurable and Manageable

Coaches should keep the three Ms of crafting KPIs in mind when working with teams.

  1. Meaningful: KPIs should be meaningful to project stakeholders. Developing metrics that those closest to the project team find useful without getting feedback from a broader group of stakeholders can be a recipe for stakeholder disengagement. The KPIs a team selects need to resonate with the stakeholders closest to the process and the problem. The team will know it is on the right track when it has KPIs that stakeholders want to know the current status of and are discussing progress toward the project goals with their colleagues. Meaningful KPIs make excellent additions to departmental data walls for use in daily huddles and to support the efforts of leaders to get out on the floor and speak directly with employees. leader rounding.
  2. Measurable: KPIs should be easily measurable. Sometimes teams can get stuck trying to identify the “perfect” metric for measuring progress toward their project goals. In this pursuit, the team may lose sight of metric options that are already available or automatically reported. Sustainable KPIs should be relatively easy to obtain updates for. If a metric requires time-consuming auditing, or is not readily available to the project team, groups should think twice before selecting it as a KPI. Data that is challenging or time-consuming to obtain is not likely to be regularly updated and reported to stakeholders. Providing timely and accurate updates on KPI performance is an excellent way to support the sustainability of improvements and spark conversations about additional opportunities to enhance processes and reach the team’s goals.
  3. Manageable: KPIs should include metrics that are within the sphere of management control and influence for the project team. If the team selects metrics that include measuring process elements that the team has no control over, then they are not going to be measuring what matters. Teams should select KPIs that are within the scope of their project, are reflective of a successful outcome and are performance drivers for their work. Sometimes nice-to-have or might-be-interesting metrics can sneak onto the KPI list for project teams. These additional metrics are not needed; the team should focus in on the metrics that will provide accurate feedback on its performance.

Summary

Remember that successful KPIs:

  • Include a balance of outcome metrics and process metrics.
  • Total three to six metrics.
  • Are developed with the 3Ms in mind.

Crafting KPIs is an important step to guide teams through a continuous improvement process. A coach needs to keep the team focused on what success looks like and how best to measure it.

3 Ways to Gain Buy-In for Continuous Improvement

Research out of the Juran Institute, which specializes in training, certification, and consulting on quality management globally, reveals that only 30 percent of improvement initiatives succeed

 

And why do these initiatives fail so frequently? This research concludes that a lack of management support is the No. 1 reason quality improvement initiatives fail. But this is certainly not a problem isolated to just continuous improvement, as other types of strategic initiatives across the organization face similar challenges. Surveys of C-level executives by the Economist Intelligence Unit concur—sharing that lack of leadership buy-in and support can stop the success of many strategic initiatives.

Why Else Do Quality Initiatives Fail? 

Evidence shows that company leaders just don’t have good access to the kind of information they need about their quality improvement initiatives. 

Even for organizations that are working hard to assess the impact of quality, communicating impacts effectively to C-level executives is a huge challenge. The 2013 ASQ Global State of Quality report revealed that the higher people rise in an organization’s leadership, the less often they receive reports about quality metrics. Only 2% of senior executives get daily quality reports, compared to 33% of front-line staff members.  

So why do so many leaders get so few reports about their quality programs? Scattered, and inaccessible project data makes it difficult to piece together the full picture of quality initiatives and their impact in a company. Because an array of applications are often used to create charts, process maps, value stream maps, and other documents, it can be very time consuming to keep track of multiple versions of a document and keep the official project records current and accessible to all key stakeholders.

On top of the difficulty of piecing together data from multiple applications, inconsistent metrics across projects can make it impossible to evaluate results in an equivalent manner. And even when organizations try quality tracking methods, such as homegrown project databases or even full-featured PPM systems, these systems become a burden to maintain or end up not effectively supporting the needs of continuous quality improvement methods like Lean and Six Sigma.

Overcoming Limited Visibility 

Are there ways to overcome the limited visibility stakeholders have into their company’s quality initiatives? For successful strategic initiatives, it has been identified that planning and good communication are drivers for success. These drivers also positively impact successful continuous improvement projects.

1. Ensure efficiencyUtilize a complete platform for managing your continuous improvement program to reduce inefficiencies. Using one platform to track milestones, KPIs, and documents addresses redundancies of gathering key metrics from various sources needed to report on projects, saving teams hours of valuable time. Looking past the current project at hand, one platform can also make it easy to quickly replicate processes such as roadmaps and templates that were useful in previous quality initiatives.

2. Aim for consistency. Centralize your storage by making all relevant documents accessible to all team members and stakeholders. As teams grow and projects become more complex, the benefit of having all team members aligned can prevent confusion and reduce the number of back and forth emails that tend to happen. 

3. Real-time visibility for all. Visibility into the progress of your quality project facilitates the daytoday management of tracking results and addressing any challenges. Utilize dashboards to provide a quick “snapshot” of your project’s progress. Cloud-based capabilities takes your dashboard to the next level—instantly communicating real-time results. 

Drive for Excellence 

For quality professionals and leaders, the challenge is to make sure that reporting on results becomes a critical step in each project and that all projects are using consistent metrics that are easily accessible. Teams that can do this will find reporting on their results a manageable taskfacilitating the needed visibility to all key stakeholders that’s necessary for leadership buy-in.  

 

Understanding Qualitative, Quantitative, Attribute, Discrete, and Continuous Data Types

“Data! Data! Data! I can’t make bricks without clay.”
— Sherlock Holmes, in Arthur Conan Doyle’s The Adventure of the Copper Beeches

Whether you’re the world’s greatest detective trying to crack a case or a person trying to solve a problem at work, you’re going to need information. Facts. Data, as Sherlock Holmes says.

jujubes

But not all data is created equal, especially if you plan to analyze as part of a quality improvement project.

If you’re using Minitab Statistical Software, you can access the Assistant to guide you through your analysis step-by-step, and help identify the type of data you have.

But it’s still important to have at least a basic understanding of the different types of data, and the kinds of questions you can use them to answer.

In this post, I’ll provide a basic overview of the types of data you’re likely to encounter, and we’ll use a box of my favorite candy—Jujubes—to illustrate how we can gather these different kinds of data, and what types of analysis we might use it for.

The Two Main Flavors of Data: Qualitative and Quantitative

At the highest level, two kinds of data exist: quantitative and qualitative.

Quantitative data deals with numbers and things you can measure objectively: dimensions such as height, width, and length. Temperature and humidity. Prices. Area and volume.

Qualitative data deals with characteristics and descriptors that can’t be easily measured, but can be observed subjectively—such as smells, tastes, textures, attractiveness, and color.

Broadly speaking, when you measure something and give it a number value, you create quantitative data. When you classify or judge something, you create qualitative data. So far, so good. But this is just the highest level of data: there are also different types of quantitative and qualitative data.

Quantitative Flavors: Continuous Data and Discrete Data

There are two types of quantitative data, which is also referred to as numeric data: continuous and discreteAs a general rule, counts are discrete and measurements are continuous.

Discrete data is a count that can’t be made more precise. Typically it involves integers. For instance, the number of children (or adults, or pets) in your family is discrete data, because you are counting whole, indivisible entities: you can’t have 2.5 kids, or 1.3 pets.

Continuous data, on the other hand, could be divided and reduced to finer and finer levels. For example, you can measure the height of your kids at progressively more precise scales—meters, centimeters, millimeters, and beyond—so height is continuous data.

If I tally the number of individual Jujubes in a box, that number is a piece of discrete data.

a count of jujubes is discrete data

If I use a scale to measure the weight of each Jujube, or the weight of the entire box, that’s continuous data.

Continuous data can be used in many different kinds of hypothesis tests. For example, to assess the accuracy of the weight printed on the Jujubes box, we could measure 30 boxes and perform a 1-sample t-test.

Some analyses use continuous and discrete quantitative data at the same time. For instance, we could perform a regression analysis to see if the weight of Jujube boxes (continuous data) is correlated with the number of Jujubes inside (discrete data).

Qualitative Flavors: Binomial Data, Nominal Data, and Ordinal Data

When you classify or categorize something, you create Qualitative or attribute data. There are three main kinds of qualitative data.

Binary data place things in one of two mutually exclusive categories: right/wrong, true/false, or accept/reject.

Occasionally, I’ll get a box of Jujubes that contains a couple of individual pieces that are either too hard or too dry. If I went through the box and classified each piece as “Good” or “Bad,” that would be binary data. I could use this kind of data to develop a statistical model to predict how frequently I can expect to get a bad Jujube.

When collecting unordered or nominal data, we assign individual items to named categories that do not have an implicit or natural value or rank. If I went through a box of Jujubes and recorded the color of each in my worksheet, that would be nominal data.

This kind of data can be used in many different ways—for instance, I could use chi-square analysis to see if there are statistically significant differences in the amounts of each color in a box.

We also can have ordered or ordinal data, in which items are assigned to categories that do have some kind of implicit or natural order, such as “Short, Medium, or Tall.”  Another example is a survey question that asks us to rate an item on a 1 to 10 scale, with 10 being the best. This implies that 10 is better than 9, which is better than 8, and so on.

The uses for ordered data is a matter of some debate among statisticians. Everyone agrees its appropriate for creating bar charts, but beyond that the answer to the question “What should I do with my ordinal data?” is “It depends.”  Here’s a post from another blog that offers an excellent summary of the considerations involved.

Additional Resources about Data and Distributions

For more fun statistics you can do with candy, check out this article (PDF format): Statistical Concepts: What M&M’s Can Teach Us.

For a deeper exploration of the probability distributions that apply to different types of data, check out my colleague Jim Frost’s posts about understanding and using discrete distributions and how to identify the distribution of your data.

%d bloggers like this: